

Fort Custer Industrial Park South Campus
Located off I-94 at Exit 92 between Battle Creek and Kalamazoo, Fort Custer Industrial Park South Campus is a fully built-out industrial development totaling more than 770,000 square feet of Class A space. Developed by Clark Logic and Great Lakes Capital, the campus offers strategic access to a major Michigan logistics corridor and supports large-scale manufacturing and distribution operations.
211 Watkins Road | Battle Creek, MI
The first phase of the campus was completed in 2021 with a 270,000-square-foot warehouse featuring nine dock doors and two overhead doors. The facility was sold to Zoetis in 2025.
201 Watkins Road | Battle Creek, MI
Totaling 504,000 square feet, 201 Watkins Road was developed in two 252,000-square-foot phases, which were completed in 2025 and 2026, respectively.
The completed facility features 32’ clear heights, 26 dock doors (with additional knockouts for future docks), four overhead doors, and flexible office and administrative build-out options.


PROJECT SNAPSHOT:






